该标准是在SY/T 5954-94《开钻前验收项目及要求》的基础上修订而成的,由江苏石油勘探局钻井处负责起草,规定了石油天然气钻井的井场布置与设备基础、设备安装、钻井工程准备、后勤供应、安全和环境保护等开钻前验收项目的内容和要求,适用于陆上石油天然气钻井的一开钻进前验收。
该标准与SY/T 5954-94相比,主要变化如下:
——增加了防洪防汛、防火、防爆安全预案方面的要求;
——增加了钻井液池废弃物的现场处理、井场废弃物及生活垃圾的处理、井场噪音降消装置等方面的要求;
——增加了柴油机安装要求及电动钻机的安装要求。:
主要描述了:
(1)钻前工程 (2)设备安装 (3)钻井工程准备 (4)后勤供应 (5)安全 (6)环境保护
SY/T 5954-2004 Inspection items and requirements prior to spudding
The standard is revised on the base of standard SY/T 5954-94 Inspection Items & Specification Prior to Spudding, was drafted by Drilling Company of Jiangsu Oil Exploration Corporation, specifies the inspection items and requirements for oil and gas drilling, focusing on well-site layout, equipment foundation, and equipment installation; drilling operation preparation, logistics, safety and environment protection prior to spudding and is applicable to initial spud of onshore oil and gas well drilling operation.
Compared with SY/T 5954-94, the main changes in this standard are as follows: ——Specifications of preliminary safety measures on prevention of flood, fire, explosion are added; ——Specifications on treatment of waste in drilling fluid pit, rubbish on well-site and camp, installation of noise-reducing device etc. are added; ——Installation specifications of diesel engines and electric rigs are added.
Key components: (1)Well-site preparation (2)Equipment installation (3)Drilling engineering preparation (4)Logistics supply (5)Safety (6)Environmental protection
|